The Scituate Fire Dept. responded to reported structure fire at 875 Hartford Pike
upon arrival there was a woodworking shop totally involved with an exposure problem,the exposure was invovled with fire and was stopped before any further damage was done. The fire was brought under control within a short time after arrival,extensive overhaul was done. A total of 12 units responded including 2 tankers from the Town of Foster and Canteen 2 from Providence Fire.


[This message has been edited by ffdoneng62 (edited March 14, 2000).]