1. #1
    Forum Member
    fireguy919's Avatar
    Join Date
    Mar 2005
    Location
    eastern Ohio
    Posts
    952

    Default Pictures of new station

    bays
    Attached Images Attached Images  
    Training does not make perfect. Training makes permanent!

    IACOJ probie

  2. #2
    Forum Member
    fireguy919's Avatar
    Join Date
    Mar 2005
    Location
    eastern Ohio
    Posts
    952

    Default

    Office side
    Attached Images Attached Images  
    Training does not make perfect. Training makes permanent!

    IACOJ probie

  3. #3
    Forum Member
    firenresq77's Avatar
    Join Date
    Oct 2000
    Location
    Northwest Ohio
    Posts
    5,213

    Default

    Looks nice........ When was it built? How Big? How much $$$?
    The comments made by me are my opinions only. They DO NOT reflect the opinions of my employer(s). If you have an issue with something I may say, take it up with me, either by posting in the forums, emailing me through my profile, or PMing me through my profile.
    We are all adults so there is no need to act like a child........
    IACOJ

  4. #4
    Forum Member
    fireguy919's Avatar
    Join Date
    Mar 2005
    Location
    eastern Ohio
    Posts
    952

    Default

    Thanks. Took us two years six months to have it complete we had lots of problems. Everything from contractor that jumped town(till in litigation), to old natural gas well to EPA on our septic system. We moved in beginning of April. Grand total was little over $800k. Iím trying to find the exact dimensions of the building. I know it is 10,153 square feet. The training room hold 65. Which we are very proud of. Four bays across the front, two drive through from the back. We have two engines, two tankers, mini pumper, brush truck, and a Jeep Cherokee we use for EMS first responder. On the office side is radio room, male and female public restrooms handicap assessable, lounge training room, exercise room with rest rooms and showers male and female, conference room, association presidents office, chiefs office, treasurer and secretary office, and health and safety office. The building we was in was built in 1949 and had gone through many revisions. We had to back in off the main road and had 3 inches on either side of the mirrors on the one engine. Since we moved we added an engine and a tanker to the fleet. When I find the dimensions I will post them. Iím think it is 130x80 but I wont swear to it.
    Training does not make perfect. Training makes permanent!

    IACOJ probie

  5. #5
    Forum Member
    fftrainer's Avatar
    Join Date
    Feb 1999
    Location
    Northern, NJ
    Posts
    889

    Default

    Nice station! What are the yellow things parked in the pays?? Did the contractor leave his equipment there or something??

    We are on blueprint revision 1 million and something for an addition so this was of interest... thanks for the pics!

Thread Information

Users Browsing this Thread

There are currently 1 users browsing this thread. (0 members and 1 guests)