In Quarters: Kirkland, WA, Fire Station 22

Kirkland Fire Station 22 now features eight private sleep rooms, three apparatus bays, dedicated decontamination, clean circulation and a safer apparatus turnaround loop.

This facility received the Renovations Gold award in the 2026 Firehouse Station Design Awards. Find the full list of winners here. 

This fire station renovation and seismic upgrade transformed a dark, aging facility into a resilient, health-focused facility. A feasibility study determined that a remodel and addition would provide the most cost-effective solution to modernize the facility while preserving the existing site and improving firefighter operations. The renovated station includes eight individual sleep rooms, three apparatus bays, a dedicated decontamination room that has exterior access, PPE storage, enhanced living spaces and a community room that’s separated from the station operations, which allows the community room to be used for public events, department training and visiting crews without compromising station security and response.

Rather than relying on the department’s typical drive-through apparatus bays, the station uses a separate apparatus turnaround loop that allows crews to back apparatus in safely from the apron rather than on a busy public street.

This enabled the building program to wrap tightly around the bays, to reduce travel distances and create direct access from all areas of the station. One Station Design Awards judge was particularly complimentary about this decision on the part of the design team.

High-speed coiling doors and strategically located exit-only doors to the apparatus bay reduce turnout time by crews by providing them with direct access to the bays from key locations throughout the Fire Station 22.

In the original station, firefighters were required to walk through the apparatus bay to travel between the living quarters and dormitories. By extending the apparatus bays forward, the project created sufficient space for a dedicated clean circulation path between the living and sleeping areas (while still providing a single bay that’s long enough to house a future tiller as the city’s fire service deployment needs change). Returning crews now enter through an air lock that’s equipped with handwashing and bootwashing stations before they enter the clean side of the station.

A dedicated decon room means that contaminated gear doesn’t have to pass through the apparatus bay. “A major strength” of the project is how one judge deemed these facets of the renovation.

Large interior windows in the gym allow visual monitoring from the main corridor should someone require assistance while they work out. Improving daylight throughout the station was another major design objective. The original brick building contained very few windows. New window openings were coordinated with the structural engineer and prioritized in living spaces, dining areas and circulation corridors while preserving the existing structure. Large interior windows provide indirect daylighting into interior spaces, such as the hallways. Solar tubes provide natural light in office areas where exterior windows weren’t feasible.

Each individual sleep room includes a programmable alerting screen that allows firefighters to receive tones only for their assigned apparatus. Individual temperature controls provide personalized comfort. Low-level corridor lighting reduces ocular stress during nighttime responses.

The original station’s hidden entrance often led visitors to approach the apparatus bay doors. The renovation established a prominent public entrance that has an extended canopy, to create a stronger civic presence and improve wayfinding. The sloping site was redesigned to provide accessible parking and an Americans with Disabilities Act-compliant route to the main entrance.

Two judges awarded a score of 9 (with 10 being the highest) for the building’s Overall Architectural Design features. The average score of all seven judges was 8. Said one judge, “The overall appearance is a significant improvement over the original facility” and, overall, “a very successful renovation.”

Contributors:

About the Author

Firehouse.com News

Content curated and written by Firehouse editorial staff, including Susan Nicol, Peter Matthews, Ryan Baker and Rich Dzierwa.

Sign up for our eNewsletters
Get the latest news and updates

Voice Your Opinion!

To join the conversation, and become an exclusive member of Firehouse, create an account today!